Song Khe – Noi Hoang Industrial Park is located in Yen Dung district, right at the northern gateway of Bac Giang city. The industrial park has a very convenient transportation system in terms of railways, waterways and roads: next to the National Highway 1A, 5 km way from Bac Giang City; 45 km from Hanoi capital; 45 km from Noi Bai International Airport; 115 km from Hai Phong Port; 115 km Huu Nghi Quan border gate (Lang Son); 125 km from Cai Lan deep-water port (Quang Ninh).

– Planning area: 180 ha, can be expanded to 300 ha. Besides, it is planned to spend 10 hectares to build the housing area for workers.

Term: 50 years (2007 – 2057)

Land legal: Pink book

Orientation of industrial park: Song Khe – Noi Hoang is oriented as a multi-industry industrial park, using modern high technology in accordance with international standards, being eco-friendly, expected to attract the following industries:

o Mechanical assembly, spare parts production, electronic components

o Production of consumer goods, handicrafts

o Textile industry

o Food and agricultural product processing and some other industries

– Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park.

o Main roads: 32 m wide – 4 lanes

o Branch roads: 23 m wide – 2 lanes

– Landscape: More than 12% of the total area of ​​the industrial park is planted with trees

Power supply system: The power supply to the industrial park is taken from an international standard 110/22KV substation.

Water supply system: Treated water is supplied with a capacity of 30,000 m3 per day from Bac Giang treated water station. Water is supplied to the factory fence by an international standard water supply pipe system.

Industrial park management fee: $0.30/m2/year. This fee is paid annually in the first month of the year.

Clean water usage fee: $0.30/m3. The amount of clean water used is calculated according to the reading on the water meter

Electricity usage fee: Mid-peak hours VND 1,405 /KW; Off-peak hours (22:00 – 4:00): VND / KW; On-peak hours (9:30 – 11:30 & 17:00 – 20:00): VND 2,556/ KW;

Fire Fighting and Prevention system: The industrial park is installed with a Fire Fighting and Prevention system which is in strict compliance with national regulations. Fire hydrants are installed at the internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.

Khu công nghiệp Song Khê Nội Hoàng - Bắc Giang

Song Khe – Noi Hoang Industrial Park was constructed by 02 developers

1.  Song Khe – Noi Hoang Industrial Park (Northern area).

– Area: 110 hectares.

– Technical infrastructure: Internal roads, storm water drainage, wastewater collection, 6,000 m3/day centralized wastewater treatment station, post and telecommunications services, banking, electricity supply system, water supply system from Bac Giang treated water station to enterprise’s fences….

– Developed by: Bac Giang Industrial Park Infrastructure Development Company

2. Song Khe – Noi Hoang Industrial Park (Southern area).

– Area: 44.9 hectares.

– Technical infrastructure: Internal roads, storm water drainage, wastewater collection, 1,200 m3/day centralized wastewater treatment station, post and telecommunications services, banking, ICD inland port, 110/22KV power station, water supply system from Bac Giang treated water station to enterprise’s fences….

– Developed by: FuJi Bac Giang Development Joint Stock Company

– Address: Song Khe Industrial Park – Noi Hoang (Southern area), Yen Dung district, Bac Giang province