Implementation progress at Nhon Depot, line 3, Nhon – Hanoi Station section
The construction of Nhon Depot belongs to construction package CP05 – Architectural works at Depot. This package consists of 21 key components in Operations Control Center (OCC) and workshops. At present, OCC construction and tile components are complete. Besides, the project has completed concrete and steel structures for eight workshops and is building three workshops and three electrical houses.
(Hanoi Metro Railway)